Minimal over-excavation with regular trench walls and floor. Spoil is deposited in a continuous windrow alongside the trench. where the space is limited, spoil must be discharger to dump truck directly with a truck loader conveyor.
Suitable for use in built-up areas or in proximity to utilities, structures and other pipeline.